Chain Slings
Crane and Hoist Hand Signals
Crane Hitches
Crane Maintenance
Crane Pre-operation Inspection
Hoist Wire Rope
Lifting With Eye Bolts
Overhead Crane Operation
Plate Clamp Inspection and Use
Slinging on Overhead Crane Hooks
Synthetic Web Slings
Use of Materials Hoists
Use of Shackles
Wire Rope Slings
More Information
About OSH Answers
Feedback
Disclaimer
Inquiries Service

The Inquiries Service at CCOHS answers questions on the health or safety concerns people have about the work they do.

About the Inquiries Service
Ask a Question

Overhead Crane Operation

What should you do before moving a load?
How should you move loads safely?
What should you do before leaving the crane?
What should you avoid when operating an overhead crane?


What should you do before moving a load?

  • Ensure all loose materials, parts, blocking and packing have been removed from the load before lifting.
  • Remove any slack from the sling and hoisting ropes before lifting the load.
  • Make sure that the lifting device seats in the saddle of the hook.
How should you move loads safely?

  • Move crane controls smoothly. Avoid abrupt, jerky movements of the load.
  • Follow signals only from one slinger in charge of the lift, except a stop signal.
  • Make sure everyone is away from the load before hoisting. Sound a bell, siren or other warning device and start to hoist slowly.
  • Ensure nothing links or catches on the load while raising it or traveling.
  • Ensure that nothing obstructs the movement of a load.
  • Keep the load under control when lowering a load. If the braking system stops working, the load can usually be lowered by reversing the hoist controller to the first or second point.
  • Stay in a crane cab during power failure. Attract attention and wait for help.
What should you do before leaving the crane?

  • Remove the load hanging on crane hooks.
  • Raise all hooks to a mid position.
  • Spot the crane at a designated location.
  • Place all controls in the OFF position.
  • Open the main switch to the OFF position.
What should you avoid when operating an overhead crane?

  • Do not carry anything in your hands when going up and down ladders. Items that are too large to go into pockets or belts should be lifted to or lowered from the crane by rope.
  • Do not operate a crane if limit switches are out of order, or if cables show defects.
  • Do not lower the blocks below the point where less than two full wraps of cable remain on the drum.
  • Do not attempt lifts beyond the rated load capacity of a crane or slings.
  • Do not lift a load from the side. Centre the crane directly over the load before hoisting to avoid swinging the load.

Overhead Crane Operation

  • Do not allow anyone to ride on a load or hooks.
  • Do not leave slings dangling from the load hook. Have sling hooks placed on the sling ring when carrying slings to the load.
  • Do not raise loads higher than necessary to clear objects.
  • Do not pass a load over workers.
  • Do not reverse a motor until it has come to a full stop except to avoid accidents.
  • Do not walk on the crane runway.
  • Do not leave suspended loads unattended.
Document last updated on March 13, 2003

Copyright ©1997-2008 Canadian Centre for Occupational Health & Safety